Box Fill Calculator

Calculate electrical junction box and device box fill volume in cubic inches per NEC §314.16. Covers conductors, devices, internal clamps, studs, and grounding wires.

NEC edition

Inputs

in³

Only used when "Custom" is selected above, or enter marked volume on box

Conductors Entering the Box

qty

Count each conductor entering box. Conductors that pass through count as 1 each.

qty
qty
qty
qty

Devices & Fittings — §314.16(B)

qty

Each device = 2× volume of largest conductor in box per §314.16(B)(4)

sets

All internal clamps = 1× largest conductor per §314.16(B)(2)

qty

Each = 1× largest conductor per §314.16(B)(3)

qty

All EGCs in box = 1× largest EGC in box per §314.16(B)(5)

VoltageLab app

Take this toolkit with you on the job

The full VoltageLab electrician app — wire tables, code lookups and job-site calculators offline, on Android and iOS.

⚡ Test your knowledge
NEC Article 220 was renumbered in the 2026 code cycle. What is the new article number?
  • A. Art. 100
  • B. Art. 120
  • C. Art. 200
  • D. Art. 230
💡 NEC 2026 renumbered Article 220 (Branch-Circuit, Feeder, and Service Calculations) to Article 120.
Energy Management Systems were moved from Article 750 to which article in NEC 2026?
  • A. Art. 100
  • B. Art. 125
  • C. Art. 130
  • D. Art. 150
💡 NEC 2026 moved Energy Management Systems from Article 750 to Article 130.
Which NEC standard size overcurrent device comes after 90A?
  • A. 95A
  • B. 100A
  • C. 110A
  • D. 105A
💡 Per NEC §240.6(A), the standard sizes are …90, 100, 110, 125… There is no 95A standard size.

VoltageLab app

Studying for your electrical exam?

Practice NEC exam questions with full explanations and progress tracking, right on your phone.

How it works & the NEC rules behind it

NEC Section 314.16 dictates the maximum number of conductors, devices, and fittings permitted in standard metallic and nonmetallic electrical boxes to prevent dangerous wire damage, insulation breakdown, and arcing faults caused by crowding.

The 5 Key Components of NEC §314.16(B) Box Fill:

  • 1. Conductor Fill (§314.16(B)(1)): Each conductor originating outside the box and terminating or spliced inside counts as 1 volume unit. Conductors passing through without splice or termination count as 1 volume unit. Pigtails that originate and stay within the box count as 0.
  • 2. Clamp Fill (§314.16(B)(2)): One or more internal cable clamps count as a single volume allowance (1 volume unit) based on the largest conductor in the box. External connectors (like standard EMT connectors or Romex connectors outside the box) count as 0!
  • 3. Support Fittings (§314.16(B)(3)): Each luminaire fixture stud or hickey counts as 1 volume unit based on the largest conductor.
  • 4. Device / Equipment Fill (§314.16(B)(4)): Each standard yoke/strap containing one or more devices (receptacle, toggle switch, GFCI outlet) counts as a double volume allowance (2 volume units) based on the largest conductor connected to the device.
  • 5. Equipment Grounding Conductor (§314.16(B)(5)): All equipment grounding conductors (EGCs) entering the box count collectively as 1 volume allowance (plus 0.25 allowance for each additional EGC beyond 4 under NEC 2020+).

Formulas & equations

Total Required Volume (in³) = Conductor Vol + Device Vol + Clamp Vol + Fitting Vol + Ground Vol Box Fill % = (Total Required Volume / Available Box Volume) × 100%
Volume Allowances per Conductor (NEC Table 314.16(B)):
• #18 AWG = 1.50 in³   |   • #16 AWG = 1.75 in³   |   • #14 AWG = 2.00 in³
• #12 AWG = 2.25 in³   |   • #10 AWG = 2.50 in³   |   • #8 AWG = 3.00 in³   |   • #6 AWG = 5.00 in³

NEC reference table

Box Type & Dimensions Total Volume (in³) Max #14 Wires (2.0 in³) Max #12 Wires (2.25 in³)
3" × 2" × 2-1/2" Device Box12.5 in³65
3" × 2" × 3-1/2" Deep Device Box18.0 in³98
4" × 1-1/4" Square Box18.0 in³98
4" × 1-1/2" Standard 4-Square21.0 in³109
4" × 2-1/8" Deep 4-Square30.3 in³1513
4-11/16" × 1-1/2" Box29.5 in³1413
4-11/16" × 2-1/8" Deep Box42.0 in³2118

*Source: NEC Table 314.16(A) (Metal Boxes volume ratings without plaster rings/extensions).

Worked example, step by step

Example Calculation: 2-Gang Switch Box with (3) 12/2 NM-B Cables

Scenario: You are installing two toggle switches in a box fed by three 12/2 with ground NM-B cables with internal metal clamps.

  • Conductors: 3 cables × 2 insulated conductors = 6 × 2.25 in³ = 13.50 in³.
  • Devices: 2 toggle switches = 2 × (2 × 2.25 in³) = 9.00 in³.
  • Internal Clamps: Internal clamps present = 1 × 2.25 in³ = 2.25 in³.
  • Grounding Wires: 3 bare ground wires = 1 × 2.25 in³ = 2.25 in³.
  • Total Volume Required: 13.50 + 9.00 + 2.25 + 2.25 = 27.00 in³.
  • Box Selection: A standard 4" × 2-1/8" deep 4-square box (30.3 in³) with a 2-gang mud ring passes easily.

Frequently asked questions

No! Wire connectors (such as standard twist-on wire nuts, WAGO lever-nuts, and crimp sleeves) do not count towards box fill volume under NEC §314.16. Similarly, short pigtails that originate and stay entirely inside the box do not count.

Under NEC §314.16(A), raised mud rings, extension rings, and domed covers marked with their volume in cubic inches add directly to the total usable capacity of the electrical box.

Under NEC §314.16(B)(1), each conductor that runs through the box without splice or termination counts as **one volume allowance**.