NEC 2026 renumbered Article 220 to Article 120 and moved Energy Management Systems from Article 750 to Article 130. Use this tool to translate any 2023 reference to its 2026 equivalent — or search by topic.

⚠️ Every competitor's load calculator still cites 2023 numbers — and most still use the old values. The substance changed too. Use the correct 2026 calculator →

📋 Article Renumbering

NEC 2023 NEC 2026 Topic Type
Art. 220 Art. 120 Branch-Circuit, Feeder, and Service Load Calculations Renumbered
§220.41 §120.41 General Lighting Loads — unit load changed to 2 VA/ft² for service/feeder calc Section
§220.12 §120.13 Lighting Load — 3 VA/ft² retained for branch-circuit count only Section
§220.82 §120.82 Optional Method — Dwelling Unit; first tier changed to 8 kVA @ 100% Section
§220.54 §120.54 Dryer demand, 3–4 units — 80% demand factor Section
§220.57 §120.57 EVSE load — 2023 floors at the larger of 7,200 VA or nameplate (@125%); 2026 uses nameplate @100% with no floor once the rating is known, 7,200 VA is only the default when it is not Section
§220.83 §120.83 Existing Dwelling Addition — EVSE 80%, resistance heat 80%, other 50% Section
§220.87 §120.87 Maximum Demand from Utility Data Section
§220.61 §120.61 Neutral/Grounded Conductor Sizing Section
§220.5 §120.5 Continuous loads — §120.5(E) explicitly removes 125% requirement in load calcs Section
Art. 750 Art. 130 Energy Management Systems Renumbered
§750.1 §130.1 Scope Section
§750.30 §130.30 Load Management Control Equipment Section
Art. 110.26 Art. 110.26 Working Space — substance change in 2026, same article number Value change

⚡ Key Value Changes

These aren't just renumbering — the actual calculated values changed.

Rule NEC 2023 (old) NEC 2026 (new) Impact
Dwelling general lighting — service/feeder 3 VA/ft² (§220.12) 2 VA/ft² (§120.41) Reduces calculated service/feeder load for general lighting
Dwelling general lighting — branch circuit count 3 VA/ft² (§220.12) 3 VA/ft² retained (§120.13) Branch circuit count does NOT decrease with service size
Optional method first tier threshold First 10 kVA @ 100% (§220.82) First 8 kVA @ 100% (§120.82) Slightly increases calculated load under optional method
EVSE minimum load Larger of 7,200 VA or nameplate rating (§220.57) Same rule, renumbered only (§120.57) No calculation change — reference number only
Dryer demand — 3 to 4 units 100% (§220.54) 80% demand factor (§120.54) Reduces multifamily dryer load
Existing dwelling additions — EVSE Various 80% demand factor (§120.83) May allow additions without service upgrade
Existing dwelling additions — resistance heat Various 80% demand factor (§120.83) May allow additions without service upgrade
Existing dwelling additions — other loads Various 50% demand factor (§120.83) May allow additions without service upgrade
Continuous loads in load calculations Ambiguous — 125% required per §210.19 §120.5(E) explicitly NOT required in load calcs Eliminates double-counting of 125% factor in load calc

Ready to calculate with the correct 2026 values?